Opened: 11/21/2024 Status: Closed 11/21/2024
Installation of fountain and steel gates at front but set back from front lot line.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 3/6/2024 Status: Closed 3/6/2024
Installation of 12 modular classrooms (for 25 months) placed on practice field consistent with Planning Commision approval of campus expansion per 2022-012254CUA.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 9/13/2023 Status: Closed 9/13/2023
PLANNING REVIEW N/A - MINOR TI FOR EXISTING RESTAURANT. NO CHANGE OF USE OR EXTERIOR WORK. SEE EMAIL DATED 9/12/23
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 12/16/2022 Status: Under Review 6/14/2023
The approximately 11.4-acre Saint Ignatius College Preparatory (“the school”) school campus is bordered by 39th Avenue and the West Sunset Soccer Fields to the west, Sunset Community Garden to the north, Rivera Street to the south, and 37th Avenue to the east in the Outer Sunset neighborhood. The campus predominantly consists of 12 buildings (totaling approximately 308,242 square feet), an athletic stadium with four 90-foot-tall lights poles, and a practice field with four 40-foot-tall light poles. The project site, where construction would occur, consists of an approximately 1.9-acre (84,480 square feet) portion of the northern end of the St. Ignatius school campus.
Saint Ignatius proposes the demolition of five buildings that are grouped together on the northern portion of the project site and construction of an 182,850-square-foot addition to the existing main academic building. The buildings to be demolished total approximately 58,800 square feet in size (ranging in height from one to three stories) and include a chapel, dining hall with kitchen, administrative offices, a garage, and a 34-room dormitory. The dormitory rooms were historically for Jesuit community members working at the school. The dormitories have never been made available to the public as rental units in any manner, and no school staff or members of the Jesuit community have ever paid St. Ignatius rent for the accommodations. Currently, eight members of the Jesuit community live in the rooms, three of whom currently work at the school. With the project, three members would move to a residence in San Francisco owned by St. Ignatius, and five members would move to other residences associated with the Jesuit community in the San Francisco Bay Area. No increase in enrollment or staffing is proposed. With implementation of the proposed project, the overall square footage of campus buildings would be approximately444,242
The proposed addition to the existing main academic building would be 40 feet tall (50 feet tall with mechanical screen) with three stories over a basement and approximately 182,850 square feet. The height of the proposed addition would match the height of the existing main academic building. The addition would provide new flexible educational spaces, a chapel, dining area, and kitchen. The addition would be setback approximately 36 feet from the north property line (towards the Sunset Community Garden). The project would also construct a new retaining wall and fence at the north property line.
The project includes a new main entrance along 37th Avenue at the connection between the existing main academic building and the proposed addition; this two-story space would include tiered seating to support formal and informal school gatherings. The connection would occur at all three levels of the building to facilitate circulation between the new and existing areas. The existing vehicular access and service drive at the northern end of the campus would remain to provide access to the west side of the campus. Loading would remain at the northern end of the campus, and the existing trash and recycling area would be moved inside the building.
The project would remove 13 exterior, off-street parking spaces used by the school near the north property line and eight garage spaces dedicated for the eight Jesuit residents living in the dorm rooms. The 86 existing parking spaces at the southern end of the campus would remain. The project would provide 150 new bike parking spaces (120 class I and 30 class II spaces). The project would not remove on-street parking spaces. The project would plant 13 new street trees in front of the project site on 37th Avenue; three street trees would be removed.
Project construction would require approximately 37,000 cubic yards of excavation with a maximum depth of 19 feet below ground surface. Construction
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details 2021-011801PPA Preliminary Project Assessment (PPA) 2001 37TH AVE
Opened: 11/22/2021Status: Closed - Informational 2/7/2022
More Details The project proposes to demolish 3 buildings at the north end of the Saint Ignatius College Preparatory High School Campus and replace them with a new academic building. The existing buildings to be removed include a 1-story dining hall with a kitchen, a 1-story chapel, and a 4-story administrative office building that was formerly a dormitory. The proposed building height will match the existing adjacent academic building; it will be lowered to 3 stories over a full basement. The new building will be dedicated primarily to education uses. In addition to open flexible learning spaces, the north end of the new building will contain a cafeteria and a chapel replacing those to be demolished.
The new building will connect to the existing academic building and that intersection will become the new main entrance for the school. A two- story space with tiered seating is located at the new entrance to support formal and informal school gatherings. Connections between the existing academic building and the new building will occur at all 3 levels to facilitate circulation between the existing campus and the new building. A two-story Forum between the east and west sides of the new building will provide a large flexible space to support education and school events and bring natural light from above deep into the building. Above the Forum, a skylit environmental center will supports a broad array of educational topics connected to the natural world. Construction of the new building will eliminate 14 parking spaces along the north property line, but the existing access for loading vehicles will be replaced with a new loading area and will remain on the north end of the campus.
Project does not require a PPA (applicant submitting voluntarily)
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
2022-012254CUA Conditional Use Authorization (CUA) 2001 37TH AVENUE
Opened: 12/16/2022Status: Under Review 4/5/2023
More Details The project is a new learning center with flexible education spaces, a chapel, dining area, and kitchen. To provide this new space, the school will demolish a portion of the north end of the campus and replace it with an addition to the existing main academic building. The area to be demolished includes a chapel, dining hall with kitchen, administrative offices, a 34-room dormitory with eight occupants, and a garage. The addition includes three stories above a basement, the height of which will match that of the existing main academic building.
The project includes a new main entrance at the connection between the existing main academic building and the proposed addition. The connection will occur at all three levels of the building to facilitate circulation between the new and existing areas.
The project will eliminate the 13 exterior parking spaces used by the school along the northern property line as well as eight garage spaces dedicated for the exclusive use of the eight Jesuits living in the dorm rooms. There will still be 86 existing parking spaces at the south end of the campus that will remain. The project will provide 150 new bike parking spaces (120 Class I and 30 Class II spaces). The existing vehicular access and service drive will remain and will continue to provide access to the west side of the campus. The driveway will, however, be moved approximately 3’ to the south. The existing loading area will remain at the north end of the campus. The trash and recycling area will be moved to the inside of the building.
The project will require a Conditional Use Authorization for the following: (1) to allow a school use within the RH-1 Zoning District, (2) to amend an existing Planned Unit Development with a rear yard modification, and (3) for the removal of dwelling units (the 34 dorm rooms) per the criteria provided in Planning Code Section 317(g)(6).
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
2022-012254ENV Environmental (ENV) 2001 37TH AVENUE
Opened: 1/3/2023Status: Closed - CEQA Clearance Issued 1/15/2025
More Details The project is a new learning center with flexible education spaces, a chapel, dining area, and kitchen. To provide this new space, the school will demolish a portion of the north end of the campus and replace it with an addition to the existing main academic building. The area to be demolished includes a chapel, dining hall with kitchen, administrative offices, a 34-room dormitory with eight occupants, and a garage. The addition includes three stories above a basement, the height of which will match that of the existing main academic building.
The project includes a new main entrance at the connection between the existing main academic building and the proposed addition. The connection will occur at all three levels of the building to facilitate circulation between the new and existing areas.
The project will eliminate the 13 exterior parking spaces used by the school along the northern property line as well as eight garage spaces dedicated for the exclusive use of the eight Jesuits living in the dorm rooms. There will still be 86 existing parking spaces at the south end of the campus that will remain. The project will provide 150 new bike parking spaces (120 Class I and 30 Class II spaces). The existing vehicular access and service drive will remain and will continue to provide access to the west side of the campus. The driveway will, however, be moved approximately 3’ to the south. The existing loading area will remain at the north end of the campus. The trash and recycling area will be moved to the inside of the building.
The project will require a Conditional Use Authorization for the following: (1) to allow a school use within the RH-1 Zoning District, (2) to amend an existing Planned Unit Development with a rear yard modification, and (3) for the removal of dwelling units (the 34 dorm rooms) per the criteria provided in Planning Code Section 317(g)(6).
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
2022-012254MCM Monitoring Conditions and Mitigation Measures (MCM) 2001 37TH AVENUE
Opened: 7/8/2024Status: Monitoring Compliance 1/30/2025
More Details The approximately 11.4-acre Saint Ignatius College Preparatory (“the school”) school campus is bordered by 39th Avenue and the West Sunset Soccer Fields to the west, Sunset Community Garden to the north, Rivera Street to the south, and 37th Avenue to the east in the Outer Sunset neighborhood. The campus predominantly consists of 12 buildings (totaling approximately 308,242 square feet), an athletic stadium with four 90-foot-tall lights poles, and a practice field with four 40-foot-tall light poles. The project site, where construction would occur, consists of an approximately 1.9-acre (84,480 square feet) portion of the northern end of the St. Ignatius school campus.
Saint Ignatius proposes the demolition of five buildings that are grouped together on the northern portion of the project site and construction of an 182,850-square-foot addition to the existing main academic building. The buildings to be demolished total approximately 58,800 square feet in size (ranging in height from one to three stories) and include a chapel, dining hall with kitchen, administrative offices, a garage, and a 34-room dormitory. The dormitory rooms were historically for Jesuit community members working at the school. The dormitories have never been made available to the public as rental units in any manner, and no school staff or members of the Jesuit community have ever paid St. Ignatius rent for the accommodations. Currently, eight members of the Jesuit community live in the rooms, three of whom currently work at the school. With the project, three members would move to a residence in San Francisco owned by St. Ignatius, and five members would move to other residences associated with the Jesuit community in the San Francisco Bay Area. No increase in enrollment or staffing is proposed. With implementation of the proposed project, the overall square footage of campus buildings would be approximately444,242
The proposed addition to the existing main academic building would be 40 feet tall (50 feet tall with mechanical screen) with three stories over a basement and approximately 182,850 square feet. The height of the proposed addition would match the height of the existing main academic building. The addition would provide new flexible educational spaces, a chapel, dining area, and kitchen. The addition would be setback approximately 36 feet from the north property line (towards the Sunset Community Garden). The project would also construct a new retaining wall and fence at the north property line.
The project includes a new main entrance along 37th Avenue at the connection between the existing main academic building and the proposed addition; this two-story space would include tiered seating to support formal and informal school gatherings. The connection would occur at all three levels of the building to facilitate circulation between the new and existing areas. The existing vehicular access and service drive at the northern end of the campus would remain to provide access to the west side of the campus. Loading would remain at the northern end of the campus, and the existing trash and recycling area would be moved inside the building.
The project would remove 13 exterior, off-street parking spaces used by the school near the north property line and eight garage spaces dedicated for the eight Jesuit residents living in the dorm rooms. The 86 existing parking spaces at the southern end of the campus would remain. The project would provide 150 new bike parking spaces (120 class I and 30 class II spaces). The project would not remove on-street parking spaces. The project would plant 13 new street trees in front of the project site on 37th Avenue; three street trees would be removed.
Project construction would require approximately 37,000 cubic yards of excavation with a maximum depth of 19 feet below ground surface. Construction
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
2022-012254TDM Transportation Demand Management (TDM) 2001 37TH AVENUE
Opened: 10/23/2023Status: Pending Review 11/3/2023
More Details TDM Program request related to eliminating 13 exterior parking spaces along the northern property line and eight garage spaces. There will still be 86 existing parking spaces at the south end of the campus that will remain. The project will provide 150 new bike parking spaces (120 Class I and 30 Class II spaces). The existing vehicular access and service drive will remain and will continue to provide access to the west side of the campus. The driveway will, however, be moved approximately 3’ to the south. The existing loading area will remain at the north end of the campus.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
Opened: 7/7/2022 Status: Closed 7/7/2022
Per 2018-012648CUA, Verizon Wireless is proposing a new telecommunications facility to be installed on a stadium light including (9) total antennas, (6) RRUs, (4) surge suppressors and other supporting equipment.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 4/21/2022 Status: Closed 4/21/2022
Install 2 (N) antennae and 2 (N) FRP screens. Remove and replace 3 (E) antennae. Remove and replace 3 RRUs. Height increase under 10' (44.6 to 51.0). EFR per 6409.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 8/3/2021 Status: Closed 8/3/2021
Permit is revision to BPA 2020-1103-8079, re: installation of four (4) sports field lighting poles and fixtures including associative infrastructure and additional improvements at St. Ignatius football field. Footing size revised.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 7/28/2021 Status: Closed 7/28/2021
RAISE 3 ANTENNAS BY 5'2" AT ALPHA & GAMMA. EXTEND 1 EXISTING FRP SCREEN AT ALPHA AND GAMMA. REMOVE 3 EXISTING ANTENNAS. REMOVE 2 EXISTING RRUW B5. REMOVE 2 EXISTING RRUW BS. SEE PLAN ATTACHED.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 1/11/2021 Status: Closed 1/11/2021
remove 3 antenna, 12 rrus and install 3 rfp shrouds, 6 antenna, 6 rru. Ref cpc M-16428
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 5/18/2020 Status: Closed 8/25/2020
Remove & replace 3 (e) antennas with 3 (n) antennas. Remove & replace 2 (e) frp screens with 2 (n) frp screens; remove 3rrus and install 3 new rrus.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 6/28/2019 Status: Closed 6/28/2019
Window replacement within existing openings with custom fabricated aluminum sash.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 5/30/2019 Status: Closed 5/30/2019
Work at the ground floor of Music Building only (located behind Student Center). Interior work to convert indoor batting facility to 2 classrooms and an exiting music storage room to 1 classroom. Exterior work includes: Remove existing door at west elevation & replace with a new window in same opening - patch stucco below window sill to match; Remove 2 louvers at south elevation and insert 3 new doors and 2 new window openings per plans. No increase in enrollment, no expansion of building envelope, no work at other floors or buildings per this permit.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 3/13/2019 Status: Closed - Informational 10/6/2020
2001 37th Avenue (2094/006); Project Review meeting to discuss a proposed replacement, remodel and expansion of the north campus buildings. Applicant would like to have a Preservation and Environmental Planner attend the meeting.
Address: 2001 37TH AVE 94116
Further Info:
Related Records: None
More Details Opened: 9/14/2018 Status: Pending Review 8/23/2023
Conditional Use Authorization to permit the addition of new stadium lights on an existing football field at St. Ignatius College Preparatory. The project proposes a lighting system at the J.B. Murphy Field athletic stadium to allow for evening use and a Verizon macro wireless telecommunications services (WTS) facility consisting of nine (9) panel antennas that will be screened. The project would construct four 90-foot tall poles with LED light fixtures and the north-west pole would include the WTS facility and ancillary equipment. Installation of each pole would require up to approximately 30 feet of excavation below ground surface, resulting in a total of approximately 60 cubic yards of soil disturbance.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details 2018-012648CUA Conditional Use Authorization (CUA) 2001 37TH AVE
Opened: 9/14/2018Status: Closed - Approved 9/8/2020
More Details Conditional Use Authorization to permit the addition of new stadium lights on an existing football field at St. Ignatius College Preparatory. The project proposes a lighting system at the J.B. Murphy Field athletic stadium to allow for evening use and a Verizon macro wireless telecommunications services (WTS) facility consisting of nine (9) panel antennas that will be screened. The project will construct four 90-foot tall poles with LED light fixtures and the north-west pole will include the WTS facility and ancillary equipment.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
2018-012648CUA-02 Conditional Use Authorization (CUA) 2001 37TH AVE
Opened: 8/10/2023Status: Pending Review 8/23/2023
More Details Installation of state of the art LED lights on sports field for boys' football, lacrosse, soccer, field hockey, girls' flag football and other sports. The 90 foot tall light standards and light fixtures are installed at approximately the 10 yard line at each end and on each side (total of 4 standards) of the field. The LED lights are state of the art with minimal light spillage onto neighboring houses. In addition to installing new lights on the football field, the school plans to increase usage of lights on adjacent practice field to match timing for larger playing field.
Both sets of lights will be used up to 150 nights per year.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
2018-012648ENV Environmental (ENV) 2001 37TH AVE
Opened: 9/14/2018Status: Closed - Cancelled 9/20/2023
More Details Constructing four 90 foot tall light standards with LED lighting on the St. Ignatius College Preparatory football field. The lights will be located on either side of the field at approximately the 10 yard line at each end of the field. LED lighting is being used to reduce light spillage and provide energy efficiency.
** On September 19, 2023, the Planning Department rescinded the categorical exemption determination that it issued on June 3, 2020 for the stadium lighting project. **
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
2018-012648ENV-02 Environmental (ENV) 2001 37TH AVE
Opened: 3/28/2023Status: Under Review 4/3/2023
More Details Conditional Use Authorization to permit the addition of new stadium lights on an existing football field at St. Ignatius College Preparatory. The project proposes a lighting system at the J.B. Murphy Field athletic stadium to allow for evening use and a Verizon macro wireless telecommunications services (WTS) facility consisting of nine (9) panel antennas that will be screened. The project would construct four 90-foot tall poles with LED light fixtures and the north-west pole would include the WTS facility and ancillary equipment. Installation of each pole would require up to approximately 30 feet of excavation below ground surface, resulting in a total of approximately 60 cubic yards of soil disturbance.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
Opened: 6/20/2018 Status: Closed 7/3/2018
Pursuant to section 6409. T-Mobile Wireless is requesting approval to modify an existing wireless communications site on a building. Replacement of five (5) existing antennas with (5) new antennas
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 3/29/2018 Status: Closed 5/29/2018
Pursuant to Section 6409(a) of the Middle Class Tax Relief and Job Creation Act. AT&T WTS facility modification consisting of removal and replacement of (9) antennas; removal and replacement of (9) RRUs with 3 new RRUs; installation of (6) RRUs; installation of ancillary equipment.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 1/16/2018 Status: Closed 12/27/2018
Increase of enrollment at St. Ignatius College Prep of 90 middle school students. No construction related to the increase in enrollment. Outside bus service would be used to transports students to and from camps. Loading zones would not increase.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details 2018-000971CUA Conditional Use Authorization (CUA) 2001 37TH AVE
Opened: 1/16/2018Status: Closed - Approved 10/12/2018
More Details Conditional Use Authorization to permit the increase of enrollment at a College Prep school d.b.a St. Ignatius College.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
2018-000971ENV Environmental (ENV) 2001 37TH AVE
Opened: 2/13/2018Status: Closed - CEQA Clearance Issued 4/25/2018
More Details Increase of enrollment at St. Ignatius College Prep of 90 middle school students. No construction related to the increase in enrollment. Outside bus service would be used to transports students to and from camps. Loading zones would not increase.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
Opened: 2/11/2016 Status: Closed 2/23/2016
MODIFICATION TO AN EXTG AT&T FACILITY INCLUDING REMOVING AND REPLACING 3 ANTENNAS, INSTALLING NEW RRUS. INSTALLING NEW DC POWER CABLES. REMOVING AN EXTG DC 2 SURGE SUPPRESERS & 2 TMA; AND REPLACING WITH 3 NEW DC6 SURGE SUPPRESSORS.
Address: 2001 37TH AVE 94116
Further Info:
Related Records:
More Details Opened: 10/29/2015 Status: Closed - Informational 4/28/2017
2001 37th Avenue (2094/006); Project Review meeting to discuss installing LED lighting for it's football field; proposing to include cellular antennae at the western-most light standards and information on their preliminary master planning which will be replacing a building previously used as housing; replacing current inadequate indoor pool and building a new theatre/performing arts center.
Address: 2001 37TH AVE 94116
Further Info:
Related Records: None
More Details Opened: 1/29/2009 Status: Closed 12/24/2015
reconfiguation and minor addition to existing wireless facility (T-Mobile) from 5 to 6 antennas.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
More Details 2009.0080C Conditional Use Authorization (CUA) 2001 37th AVENUE (aka 2750 Rivera Street)
Opened: 1/29/2009Status: Closed - Cancelled 10/4/2012
More Details reconfiguation and minor addition to existing wireless facility (T-Mobile) from 5 to 6 antennas.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
Opened: 6/5/2006 Status: Closed - Informational 6/20/2006
2001 37th Ave. / 2750 Rivera St. - Add 3 new canopies over existing courtyards and walkways for an existing school, St. Ignatius Preparatory.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records: None
More Details Opened: 5/9/2005 Status: Closed
Construction of new music building with coral room, classrooms, storage, weight room, indoor batting cages and acessory space.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
More Details 2005.0451C Conditional Use Authorization (CUA) 2750 RIVERA ST
Opened: 5/9/2005Status: Closed - Approved 10/6/2005
More Details Construction of new music building with coral room, classrooms, storage, weight room, indoor batting cages and acessory space.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
Opened: 4/12/2005 Status: Closed
The project is construction of a new 14,000-gsf music building at St. Ignatius Prep School on an undeveloped portion of the campus by the athletic field and adjacent to existing structures.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
More Details 2005.0362E Environmental (ENV) 2001 37th AV
Opened: 4/12/2005Status: Closed - CEQA Clearance Issued 8/30/2005
More Details The project is construction of a new 14,000-gsf music building at St. Ignatius Prep School on an undeveloped portion of the campus by the athletic field and adjacent to existing structures.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
Opened: 12/11/2003 Status: Closed
cu for outdoor lighting per section 209.3h
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
More Details 2003.1273C Conditional Use Authorization (CUA) 2201 37TH AV
Opened: 12/11/2003Status: Closed - Approved 4/22/2004
More Details cu for outdoor lighting per section 209.3h
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
Opened: 12/27/2001 Status: Closed
The proposal is to remove the 16 existing Metricom antennas and replace them with 12 Cingular Wireless antennas, flush-mounted on the building parapet.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
More Details 2001.1203C Conditional Use Authorization (CUA) 2750 RIVERA ST
Opened: 12/27/2001Status: Closed - Approved 7/22/2002
More Details The proposal is to remove the 16 existing Metricom antennas and replace them with 12 Cingular Wireless antennas, flush-mounted on the building parapet.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
Opened: 4/26/2000 Status: Closed
WTS Facility
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
More Details 2000.399C Conditional Use Authorization (CUA) 2750 RIVERA ST
Opened: 4/26/2000Status: Closed - Approved 6/22/2000
More Details WTS Facility
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
Opened: 5/14/1998 Status: Closed
Conditional Use Authorization to install a total of nine (9) panel antennas on the roof
on the roof of an existing preparatory school and place equipment inside the existing building, under Planning Code Section 209.6(b) in the RH-1 District.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
More Details 1998.354C Conditional Use Authorization (CUA) 2750 RIVERA ST (2001 37th Av)
Opened: 5/14/1998Status: Closed - Approved 7/23/1998
More Details Conditional Use Authorization to install a total of nine (9) panel antennas on the roof
on the roof of an existing preparatory school and place equipment inside the existing building, under Planning Code Section 209.6(b) in the RH-1 District.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
Opened: 2/12/1997 Status: Closed
To allow a WTS facility in an RH-1 district.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
More Details 1997.093C Conditional Use Authorization (CUA) 2750 RIVERA ST
Opened: 2/12/1997Status: Closed - Withdrawn 5/22/1997
More Details To allow a WTS facility in an RH-1 district.
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
Opened: 9/7/1989 Status: Closed
To allow expansion of Secondary school in AN RH-1 Districtper sec. 209.3(h), and EE build additions & alterations to an existing secondaryschool to include new gym, pool bldg, 4 raised tenniscourts over existing parking, remodel offices, roof overan open interior courtyard (St. Ignatius)
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
More Details 1989.477C Conditional Use Authorization (CUA) 2001 37th Ave
Opened: 9/7/1989Status: Closed - Approved 9/13/1990
More Details To allow expansion of Secondary school in AN RH-1 Districtper sec. 209.3(h), and EE build additions & alterations to an existing secondaryschool to include new gym, pool bldg, 4 raised tenniscourts over existing parking, remodel offices, roof overan open interior courtyard (St. Ignatius)
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
1989.477E Environmental (ENV) 2001 37th Ave
Opened: 9/7/1989Status: Closed - CEQA Clearance Issued 8/3/1990
More Details To allow expansion of Secondary school in AN RH-1 Districtper sec. 209.3(h), and EE build additions & alterations to an existing secondaryschool to include new gym, pool bldg, 4 raised tenniscourts over existing parking, remodel offices, roof overan open interior courtyard (St. Ignatius)
Address: 2750 RIVERA ST, SAN FRANCISCO, CA 94116
Further Info:
Related Records:
Opened: 12/30/1965 Status: Closed - Approved 2/3/1966
Private School (St Ignatius High Sch)
Address: 0 37TH AV, SAN FRANCISCO, CA 94116
Further Info:
Related Records: None
More Details
This section does not include pending or denied applications. Eligible applicants at qualifying properties may host short-term rentals while an application is pending.